Project Name: Huizhou 1.03MW/2.06MWh Energy Storage Project
The Huizhou Industrial and Commercial User Side Energy Storage Project has a construction scale of. The project adopts Shengwei Energy's modular energy storage cabinet integrated product eBlock-172, which includes a total of 12 energy storage products. This project is the first commercial and industrial user side energy storage project in South China.

Project Name: Zhejiang Jin @ Holdings Energy Storage Project
The Zhejiang Jin @ Holdings Energy Storage Project has a construction scale of 11MW/22MWh and is divided into three energy storage units, using independent energy storage module technology. A total of 60 eBlock-372 products will be deployed.
Each energy storage unit has 22/22/16 energy blocks.

Project Name: Zhongkai New Energy Storage Demonstration Project
The total installed capacity of the project is 14.88MW/59.60MWh, which is currently the largest distributed modular energy storage project on the user side in Guangdong Province and the first energy storage project of China Nanshan Group.
After the project is put into operation, it will become one of the benchmark projects for green transformation of industry and commerce in Guangdong Province and even in China.

Project Name: Meizhou User Side Energy Storage Project
The project is located in a factory area in Meizhou City, Guangdong Province. It utilizes idle land in the factory area to construct a user side energy storage power station, equipped with 10 integrated cabinets with a capacity of 100kW/200kW · h, with a total capacity of 1MW/2MW · h.
The project adopts the strategy of "peak shaving and valley filling" and applies the operation mode of "valley charging, peak discharging, and charging and discharging twice a day".